Great excitement today – the Postman arrived with a large envelope from the National Archives. At last! But I did not find the plans I was expecting. There was a written description of the intended layout and much discussion about whether the officers and engineers could use the lavatories amidships, but no plans.
Leaping onto my computer I began to write an e-mail to the National Archives, but was interrupted by another ring on the door bell. The Postman had returned with a parcel he had overlooked – a large postal tube from the National Archives. Yes, inside were two blueprints, plan and side elevation of the Cormorant (now called Lady Dixon). So cancel the e-mail. 
 

These plans will take some time to study of course. First impressions –
The plans are annotated in pen and ink and rubber stamped. These annotations are very clear, almost as if they had been added yesterday, not 70 years ago.
There is an Aga stove indicated in the galley. Is that the one I mentioned in an earlier post?  In which case Simon cannot dispose of this historic artifact!
 
The Captain seems to have as much living space as the rest of the crew put together! 
The light is definitely fixed, with an exterior ladder for access. As there is no mention of alterations to this mast, I must assume that the Cormorant was updated sometime earlier from the original  'hoistable' lamp to a fixed lamp as seen here.
There is a ‘Diaphone Turret’ next to the main mast.
I may have solved the question of the difference in the shape of the stern between the Belfast Pilot Station photo and Simon’s ship  – a ‘boat platform’ has been added.

There is much to discover, but I will have to leave the rest for another day!
David

Wednesday, 6 November 2013

LIGHTSHIP CORMORANT / LADY DIXON - Chapter 14



CHAPTER 14  -  5 Nov 2013
I wonder if someone out there can help us with one aspect of the project. I have been wondering why the stanchions at the bow are much taller than those elsewhere and what the two massive beams were for at the bow. That rail is a definite afterthought and originally the whole of the bow was covered in and built up to the top of those two pillars, rather like on the Gull:-
  

  
Our plan is to reduce the height of those stanchions, to make them about the same as those in the rest of the ship. They will be boarded in, to match the stern – or the stern as it will be when the seating is in place. This will leave about a foot or two of the beams still projecting and we think this lends itself to some sort of figure head(s).




So, if anyone out there knows of a wood sculptor (no chain saws please) who would like to leave his mark (and not too big a bill), please get in touch.








Saturday, 2 November 2013

LIGHTSHIP CORMORANT / LADY DIXON - Chapter 13



CHAPTER 13  -  2 Nov 2013
34 years in the Army did teach me a few lessons, which I would be quite happy to pass on to the younger generation – not with any confidence that they would take heed. The one that applies to this saga of the Cormorant’s restoration/preservation is to let your boss know what you are doing and what you are going to do and never let him have to chase you to find that out. Unfortunately Simon is still experiencing the very opposite – workmen who do not turn up, do not give warning of their absence and do not respond to telephone calls, answer machine messages, texts or e-mails. “All they have to do is tell me, so I know what is going on”, says Simon quite reasonably, but they don’t.  One has even (apparently) left the planet, leaving all his tools on board. Simon is tempted to throw them into the Medway!
So things are going very slowly at the moment and although the new kitchen is lit, plumbed and looking a lot better, the port side picture window is not yet fitted.


 That small Aga is not part of the kitchen equipment and Simon is trying to work out how to remove it from the ship and what to do with it when it is ashore.

This kitchen and the living room are insulated with rigid foam panels behind plasterboard, but the shapes of the ‘walls’ below deck do not lend themselves to this method . 


There is also a need to prevent condensation forming. Simon’s plan is to spray foam insulation down there, then cover with boarding which follows the contours. But, the ship is over 400ft from shore, near the end of a long, narrow catwalk. The only firms he has found so far have their equipment mounted in vehicles, with a maximum hose length of 150ft. A problem yet to be solved!

While Simon is sorting this out and finding more, reliable, tradesmen, and I am waiting for the arrival of those 1943 plans from the National Archives, I can get back to the mystery of the main mast and its access point or points. The mast has several badly defined panels, so where exactly is the door and how tall is it ….?            This                    This                 This                 or this?


Tuesday, 29 October 2013

LIGHTSHIP CORMORANT / LADY DIXON - Chapter 12



CHAPTER 12 –  29 Oct 13

The long-awaited documents finally arrived from the National Archives – well the first batch anyway. We did not expect these to be helpful in resolving the puzzle of whether Cormorant was the same vessel as the one in the Belfast Pilot Station photo, however they were fascinating in their own right.

Firstly, the origin of the paperwork was a request from the Belfast Harbour Commissioners to have the Cormorant registered as a British ship and to have her surveyed and measured. The Cormorant was obviously still in Dublin at this point in time. I assume the nationality distinction arose because the body responsible for  ‘lights’ (lighthouses and lightships) around Ireland has always been combined north and south (and still is). Now that Belfast Harbour was going to use the ship for purely Belfast purposes, they wanted it ‘properly’ registered. On the face of it there was no problem, but a question arose as to whether the term ‘ship’ was appropriate! The Merchant Shipping Act 1894 stated that if a vessel is not used in navigation, it is not a ship within the meaning of the Act and, if solely employed as a lightship, would fall under the definition of a lighthouse!

However, it was accepted for registration on the grounds that a Ministry of War Transport 21 (a derrick pontoon) has been accepted, so why not this lightship? This was in no way to settle the question of whether it could be called a ship – “… this being a matter for the courts”.

There was also a question of fees for the Belfast surveyors visiting Dublin. In the end ‘normal’ fees and expenses were charged (but not listed) as Dublin could be considered as not being ‘abroad’ ‼

Although many records state that Cormorant was 91 ft long, these documents have her at 98ft 6in, with a beam of 20ft. Her Gross Tonnage was 182.98 and Register Tonnage 136.33, although I have not yet determined the reason for the difference. Her Official Number was 168531. She had no means of propulsion, but did have a rudder.

Finally, the alterations to the vessel were to be carried out in Dublin. She was to become a combined lightship and pilot station, with a crew of 10 and accommodation for 9 pilots.

The second batch of documents should be here next week. I can hardly wait!

Thursday, 24 October 2013

LIGHTSHIP CORMORANT / LADY DIXON - Chapter 11



CHAPTER 11  -  24 Oct 13

With Winter approaching, young men’s fancy turns to – dryness and warmth‼ Because most of the teak decking has long gone, there is only rusty metal plate between the cold night air and the (future) living space below deck. Condensation is also quite a problem and because the drain holes are above the plate level, there are all sorts of leaking opportunities when it rains. Hopefully we have a cunning plan which will solve both problems. The sides of the ship are a separate project!
I related in Chapter 7 how the plan was to fill in the space left by the absent decking with a thick layer of all-weather ‘tennis court’ surfacing. This was going to be very difficult (the deck has a slight curve to facilitate drainage and following that curve with a fluid whilst maintaining a constant thickness …. need I say more?).
So now Simon is being advised by a professional roofer and a more complicated, but more feasible plan is emerging. Looking at the more difficult part of the deck – the curved walkways down each side, which have light-boxes built in …..

First the deck will be given a coat of primer. Then short lengths of timber, about the thickness of scaffolding-type planking, will be wedged across the walkways, at 5ft intervals, between the superstructure and the wide baulks of timber which edge the ship. The intervening spaces will be filled, to the same height, with roof insulation panels.


Then bitumen is poured into all the gaps
 
Sheets of marine ply are now laid over and secured to the planks. The surface is then treated like a roof – with bitumen and that gravelly bitumen sheeting you see on flat roofs.


The green colour of the bitumen sheeting is merely to differentiate it from the ply.

Then Simon can have a thin coat of tennis court material if he chooses. The light boxes will be double-glazed and the deck will then be insulated and leak-proof.

That's the plan anyway!